翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Heavy Equipment Transporter : ウィキペディア英語版
Heavy Equipment Transport System

Heavy Equipment Transport System (abbreviated as HETS) is a term applied (primarily) to a U.S. Army logistics vehicle transport system, the primary purpose of which is to transport the M1 Abrams tank. It is also used to transport, deploy, and evacuate armored personnel carriers, self-propelled artillery, armored bulldozers and other heavy vehicles and equipment of all types.
The current U.S. Army vehicle used in this role is an Oshkosh-built M1070 tractor unit which is coupled to a DRS Technologies M1000 semi-trailer. This combination replaced the earlier Oshkosh-built M911 tractor unit and M747 semi-trailer.
==M1070/M1000==

(詳細はOshkosh Truck Corporation (now Oshkosh Defense) proposed the M1070. A contract for 1044 M1070 was placed, with production commencing in July 1992.
The final U.S. Army contract for the original A0 version called for 195 vehicles. These were delivered between March 2001 and March 2003. U.S. Army deliveries of A0 versions totalled 2,488.〔 Following extensive use, some M1070 have been Reset to original build standard by Oshkosh.〔
The M1070E1 model was developed in the mid-1990s in conjunction with the U.S. Army as a possible Technology Insertion Programme (TIP) for the M1070. No orders were placed.〔
In March 2008 Oshkosh Defense announced the award of a contract from the U.S. Army to begin engineering and initial production of the next-generation of HET. 〔 Oshkosh announced in October 2010 its first delivery order for the M1070A1 HET. Production of the M1070A1 concluded in August 2014, with new vehicle production totalling 1,591.〔
The trailer used with the M1070A0 and M1070A1 is the M1000.〔(【引用サイトリンク】title=TECHNICAL MANUAL OPERATOR'S MANUAL FOR TRUCK, TRACTOR, 8X8 M1070 A1 NSN 2320-01-564-6882 )〕 The M1000 was originally developed as a private venture by Southwest Mobile Systems (later Systems & Electronics Inc (SEI), now DRS Technologies) as a response to a possible US Army requirement for transporting M1 and M1A1 MBTs. A production order for 1,066 M1000 units was placed by the U.S. Army in 1989. By July 2009 more than 2600 M1000 trailers had been ordered.〔
The M1070 and M1000 are both air-transportable by C-5 Galaxy or C-17 Globemaster III aircraft.
The M1070 replaced the Scammell Commander as the British Army heavy tank transporter in 2001. The UK version (M1070F) is compliant with European legislation on emissions (EURO III).

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Heavy Equipment Transport System」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.